March 6, 2013
Wheeling bridge could be closed for 3 weeks
Advertiser

WHEELING, W.Va. -- A state bridge engineer says the Wheeling Suspension Bridge likely won't reopen for at least three weeks.

The Division of Highways closed the historic bridge Saturday after a cable on top of the span snapped on the downtown Wheeling side. The cable helps to keep the bridge from swaying.

DOH bridge engineer Dave Sada tells media outlets that rust and corrosion caused the cable to snap. The problem was discovered during a routine inspection of the 164-year-old bridge.

The DOH hasn't determined how much repairs will cost.

 

Recommended Stories

Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.
Popular Videos
The Gazette now offers Facebook Comments on its stories. You must be logged into your Facebook account to add comments. If you do not want your comment to post to your personal page, uncheck the box below the comment. Comments deemed offensive by the moderators will be removed, and commenters who persist may be banned from commenting on the site.
Advertisement - Your ad here
Get Daily Headlines by E-Mail
Sign up for the latest news delivered to your inbox each morning.
Advertisement - Your ad here
News Videos
Advertisement - Your ad here
Advertisement - Your ad here